A POTT scheme, using transient directional elements, for a complex 525kV transmission corridor comprising long, heavily loaded and heavily series compensated parallel lines

File Type: pdf
Author: Hans Jernberg, Mike Kockott, Sinisa Zubić, Tom Roseburg, Warren Rees, Zhiying Liu

Posted

in

by

Tags: