SOME THOUGHTS ON SINGLE-POLE TRIPPINGWalter A. Elmore1996
SELECTING CTS TO OPTIMIZE RELAY PERFORMANCEGabriel Benmouyal, JEFF ROBERTS, Stanley E. Zocholl1996
A New Single-ended Fault Locator Algorithm for Greater AccuracyA.T. Johns, J. Gosalia, R. Whittard1996
ADIRONDACK 230 KV SUBSTATION OUTAGE OF JULY 1, 1995FRANK STACOM, Mohamed A. Ibrahim1996
POWER LINE CARRIER CHANNEL & APPLICATION CONSIDERATIONS FOR TRANSMISSION LINE RELAYINGMiriam Sanders, Roger L. Kay1996
Abstract GPS Satellite Synchronized Test Systems Recreate Fault Conditions to Troubleshoot Protective Relay SchemesMarlene Lillian, Stanley Thompson1996
Pole slipping protection problems and solutionsM. A. Redfern, M. J. Checksfield1996
Advancements in Adaptive Algorithms for Secure High Speed Distance ProtectionG. E. Alexander, M. G. Adamiak1996
ADVANCEMENTS IN RELAY CURRENT SENSOR TECHNOLOGYMark Adamiak, Rikk Wolfs1996
RELAY-TO-RELAY DIGITAL LOGIC COMMUNICATION FOR LINE PROTECTION, MONITORING, AND CONTROLKENNETH BEHRENDT1996
SUBSTATION COMMUNICATIONS: WHEN SHOULD fUSE EIA-232, ElA-485, AND OPTICAL FIBER?Edmund O. Schweitzer III, Karl Zimmerman1996
Distance Relay FundamentalsG. E. Alexander, J.G. Andrichak1996
COMBINED-SEQUENCE PHASE COMPARISON RELAYINGJanusz W. Dzieduszko1996
ATP SIMULATOR TEST OF LOW IMPEDANCE BUS DIFFERENTIAL PROTECTIONJ. Esztergalyos, J.P. Gosalia, R. Ryan, S.P Turner1996
STATISTICALPERFORMANCEMEASURES FOR PROTECTIVE RELAYSEric A. Udren1996
STATISTICAL COMPARISON AND EVALUATION OF PILOT PROTECTION SCHEMESEdmund O. Schweitzer III, John J. Kumm1996
THE PROTECTION SYSTEM INDEX: ONE UTILITY’S EXPERIENCEDaniel Goodrich1996
WHY UPGRADE GENERATOR PROTECTIONCharles Mozina1996
NEW GROUND DIRECTIONAL ELEMENTS OPERATE RELIABLY FOR CHANGING SYSTEM CONDITIONSArmando Guzmán1996
Experience with Numerical Generator Protection RetrofitAli Kazemi, Fernando Oliveira, Hugo Meier1996